My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 27 <br /> <br />a. Dates of inspections <br />b. Name and signature of inspector <br />c. Location of the inspection <br />d. Work inspected <br />e. Locations found to be non-compliant <br />i. Deficiencies found per location <br />ii. Actions taken to correct deficiencies <br />iii. Actions taken to mitigate future occurrences of the deficiencies <br /> <br /> Contractor must provide Project Manager(s) with a hard copy and/or electronic copies of <br /> all forms and documents prepared as part of the Quality Control Plan monitoring. <br /> <br />2.20.2 FIELD SUPERVISOR <br /> The Contractor must provide 1 qualified on-site full-time working Field Supervisor to <br />manage Contractor’s personnel at the Work sites. One (1) Field Supervisor shall be <br />assigned to the Public Works Department. These people (and their substitutes) must have <br />full authority to act for the Contractor on all matters relating to the daily performance of <br />the Work at the Work site(s). The Field Supervisor must be the central point of contact in <br />the field for the City; and, must effectively communicate i n English. The Field Supervisor <br />must understand and be able to fulfill, completely and clearly, the Performance Standards <br />and Technical Specifications and reporting requirements of the Contract. A resume of the <br />Field Supervisor must be submitted with the Contractor’s Qualifications as specified in <br />Section 7, which must include all contact information (i.e. telephone, email address, cell <br />phone, etc.). The field supervisor must have a minimum of five (5) years - combined <br />horticultural education and experience as a landscape field maintenance supervisor on <br />contracts of similar size, scope, and complexity, and must remain on-site at all times while <br />Work is being performed under the Contract. When the on-site working Field Supervisor <br />is absent for the day or for an extended period (more than 4 hours), the Project Manager (s) <br />must be notified and the Contractor must appoint a qualified substitute. Within five (5) <br />days of execution of the Contract, the Contractor must provide the Projec t Manager(s) with <br />a cellular phone number for the Field Supervisor where he/she can be reached at all times. <br /> <br />2.20.3 The Contractor must provide a minimum of six (6) full time staff, one (1) on-site Field <br />Supervisor Monday – Friday and two (2) fulltime staff during weekends with 1 one onsite <br />Field Supervisor (or additional staff as needed to meet scope of service, as determined by <br />the City). All Work shall be accomplished anytime between the hours of 7:00 A.M. to 5:00 <br />P.M. Monday through Sunday. Weekend schedule should include no less than 2 full time <br />staff and one field supervisor for debris and litter patrol in all City ROW’s. Collins Avenue <br />and Sunny Isles Blvd. shall have debris and litter removed twice daily as per section A2. <br />The minimum required staff is for routine landscape maintenance services only and does <br />not include services such as annual flower change -outs, shrub replacement, special <br />projects, irrigation repair, tree and palm pruning. The Contractor is responsible to provide <br />additional staff as needed to perform this work and all other work contained in this ITB. <br />
The URL can be used to link to this page
Your browser does not support the video tag.