Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 03300 - 2 <br />DOWNHOLE VIDEO LOG <br /> <br />controlled by the logging technician; be independent of the camera body; and have <br />focus capability. The video camera will be centralized in the borehole. The centralizers <br />will self-adjust to different casing and hole sizes as necessary. If the ENGINEER <br />determines that the video is unacceptable due to poor quality, the CONTRACTOR at <br />his expense will obtain the necessary equipment to perform additional logging to the <br />satisfaction of the ENGINEER. <br /> <br />F. Final videos will be performed prior to demobilization of the drilling rig. If based on the <br />video, the ENGINEER determines that the borehole is filled above the total drilled <br />depth, at the direction of the ENGINEER, the CONTRACTOR will clean out the filled <br />borehole section using the drilling rig or by other means approved by the ENGINEER <br />and re-video the well for final approval by the ENGINEER. <br /> <br /> <br />END OF SECTION