My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 03300 - 2 <br />DOWNHOLE VIDEO LOG <br /> <br />controlled by the logging technician; be independent of the camera body; and have <br />focus capability. The video camera will be centralized in the borehole. The centralizers <br />will self-adjust to different casing and hole sizes as necessary. If the ENGINEER <br />determines that the video is unacceptable due to poor quality, the CONTRACTOR at <br />his expense will obtain the necessary equipment to perform additional logging to the <br />satisfaction of the ENGINEER. <br /> <br />F. Final videos will be performed prior to demobilization of the drilling rig. If based on the <br />video, the ENGINEER determines that the borehole is filled above the total drilled <br />depth, at the direction of the ENGINEER, the CONTRACTOR will clean out the filled <br />borehole section using the drilling rig or by other means approved by the ENGINEER <br />and re-video the well for final approval by the ENGINEER. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.