My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1.05 HURRICANE PREPAREDNESS PLAN <br /> A. Within ten days of the date of Notice to Proceed, the Contractor shall submit to the <br /> Engineer and Owner a Hurricane Preparedness Plan. The plan should outline the <br /> necessary measures, which the Contractor proposes to perform at no additional <br /> 1 cost to the Owner in case of a hurricane warning. <br /> B. In the event of inclement weather or whenever the Engineer shall direct; the <br /> Contractor will cause Subcontractors to protect carefully the Work and materials <br /> against damage or injury from the weather. If, in the opinion of the Engineer, any <br /> portion of Work or materials shall have been damaged or injured by reason of <br /> 1 failure on the part of Contractor or any Subcontractor to so protect the Work, such <br /> Work and materials shall be removed and replaced at the expense of the <br /> Contractor. <br /> 1.06 EQUIPMENT, TESTING & INSPECTION <br /> A. Regardless of the number of days specified in the individual sections for the <br /> manufacturers representative to be present on the site for inspection and testing, if <br /> the equipment fails to perform as specified then the representative shall remain on <br /> 1 site until the malfunction is corrected and the Owner received specified days of <br /> inspection or testing. <br /> 6. The cost for the additional days required shall not be added to the cost of the <br /> Owner, but shall be to the account of the Contractor. <br /> PART 2— PRODUCTS (Not Used) <br /> PART 3— EXECUTION (Not Used) <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 05/08 01030-2 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.