Laserfiche WebLink
I <br /> 1 SECTION 01045 <br /> 1 CUTTING AND PATCHING <br /> PART1 - GENERAL <br /> I1.01 WORK INCLUDED <br /> I A. Contractor shall be responsible for all cutting, fitting and patching, including <br /> attendant excavation and backfill, required to complete the work or to: <br /> 1 1. <br /> 2. Make its several parts fit together properly. <br /> Uncover portions of the Work to provide for installation of ill-timed work. <br /> 3. Remove and replace defective work. <br /> I 4. Remove and replace work not conforming to requirements of Contract <br /> Documents. <br /> 5. Remove samples of installed work as specified for testing. <br /> 6. Provide routine penetrations of non-structural surfaces for installation of <br /> Ipiles, piping, and electrical conduit. <br /> 7. Investigate subsurface conditions or utilities. <br /> I1.02 RELATED WORK <br /> A. Section 01010: Summary of Work <br /> I1.03 SUBMITTALS <br /> I A. Submit a written request to the Engineer well in advance of executing any cutting <br /> or alteration that affects: <br /> I 1. Work of the Owner or any separate contractor. <br /> 2. Structural value or integrity of any element of the Project. <br /> 3. Integrity or effectiveness of weather-exposed or moisture-resistant <br /> elements or systems. <br /> I4. Efficiency, operational life, maintenance or safety of operational elements. <br /> Visual qualities of sight-exposed elements. <br /> IB. Request shall include: <br /> 1. Identification of the Project. <br /> I 2. <br /> 3. Description of affected work. <br /> The necessity for cutting, alteration or excavation. <br /> 4. Effect on work of Owner or any separate contractor, or on structural or <br /> I 5. weatherproof integrity of Project. <br /> Description of proposed work: <br /> a. Scope of cutting, patching, alteration, or excavation. <br /> b. Trades who will execute the work. <br /> Ic. Products proposed to be used. <br /> d. Extent of refinishing to be redone. <br /> I 6. Alternatives to cutting and patching. <br /> 7. Cost proposal, when applicable. <br /> I05/08 01045-1 05-4893 <br />