Laserfiche WebLink
CRDWDER CrowderGulf <br /> 1 j GULF RFP Disaster Debris Management and Disposal Services 18-04-02 <br /> City of Sunny Isles Beach, FL <br /> Methods of Debris Reduction <br /> There are two primary types of reduction methods — incineration and '. - . <br /> chipping/grinding. After all major storms, we have used both grinding and - , <br /> I burning to reduce debris, however,grinding has become the more common , ; 2:-',7.--,47,t16 _ -, .., <br /> method due to environmental issues with burning. `, �, t.,,i <br /> • Chipping and Grinding .` ,- j 4 <br /> The chipping and grinding of vegetative debris reduces the volume by 75% - .„;-;.,41:-..i.."1-,,;:::. „,-;,.. - . /; <br /> rt. .�c,4 Itis_ ' .P,l <br /> Many times clean chips will be recycled as bio mass fuel. iF <br /> �, f - a;r <br /> CrowderGulf is very experienced with chipping/grinding debris and has used <br /> this method in the majority of our disaster contracts for the past ten years. When grinding/chipping is utilized as the reduction <br /> method, all safety and compliance regulations are enforced throughout the operation. <br /> CrowderGulf has ground over 35 million cubic yards of debris since 2003. <br /> • Incineration <br /> There are several incineration methods available for volume reduction.These include uncontrolled open-air incineration,controlled <br /> open-air incineration, air curtain pit incineration and portable air curtain incineration. Portable air curtain incineration is the most <br /> efficient incineration system available because the pre-manufactured pit is engineered to precise dimensions to complement the <br /> blower system.Any burning method used will only be conducted with concurrence from the City of Sunny Isles Beach . <br /> Burning vegetative debris can produce up to a 95% reduction rate. In those situations where air curtain incineration may be <br /> approved bythe Ci all environmental compliance and safetyconcerns will be addressed within the site specific plan. Setbacks <br /> pP City, p P <br /> and buffer zones will be established within and around the reduction sites not only for the public safety but also for the safety of <br /> Il the debris operations. A setback of at least 100'will be maintained between the debris piles and the incineration area. There will <br /> be a buffer of 1,000' between the incineration area and the nearest building in order to create a zone for emergency vehicles, if <br /> needed. The fire will be extinguished two hours before anticipated removal of the ash mound. _ <br /> I; The ash mound will be removed before it reaches two feet below the lip of the incineration pit. To prevent explosions, hazardous <br /> or contaminated flammable material will not be placed in the pit. Finally, fencing and signage are simple and effective means to <br /> illkeep the public away from the incineration area. <br /> f <br /> Side View A <br /> 1 . Side View B Top Yew <br /> Pit i'it Pit.. <br /> Pit <br /> 1, 11 ft <br /> Pit • <br /> 9-12 ft Pit Torg <br /> 3-4 m 9.-12 ft.�• Pit <br /> deep e,m 3-4 m <br /> wide <br /> The CrowderGulf Environmental Protection Plan will address and provide detailed guidance on DMS environmental concerns <br /> II such as dust,smoke,erosion,storm water plus hazardous and toxic wastes. If the DMS is near an environmentally sensitive area <br /> or has historical sites in close proximity,special environmental consideration will be taken to protect and preserve such areas. <br /> 1 <br /> II <br /> 71 <br />