Laserfiche WebLink
1 <br /> ACCOUNTING AND DOCUMENT MANAGEMENT <br /> DRC's invoicing procedure is as follows: <br /> • Load tickets are received,logged,and then scanned into DRC's database system. Tickets are then entered and <br /> audited for accuracy. <br /> • Invoice is worked up along with the ticket data backup. <br /> • The reconciliation process then takes place with either the Monitoring Firm or the reconciliation contact with <br /> the municipality(if there isri t a Monitoring Firm). <br /> • Once the invoice and ticket data has been 100% reconciled,the Monitoring Firm,or the reconciliation contact <br /> with the municipality,then recommends the invoice to FEMA for payment. <br /> • Frequency: The invoicing is usually done on a weekly basis <br /> REQUIRED DOCUMENTATION <br /> DRC ES shall submit daily progress and quality control reports to the governing entity for all activities. Each report <br /> would contain,at a minimum,the following information: <br /> • Letterhead with DRC name and contact information <br /> ti • Report Date <br /> • Location of completed work <br /> • Location of work for next day <br /> • Daily and cumulative hours for each piece of equipment and crew(Emergency Clearance) <br /> • List of roads that were cleared(Emergency Clearance) <br /> • Number of Crews(including number of trucks and loading equipment) <br /> • Daily and cumulative totals of debris removed,by category <br /> • Daily and cumulative totals of debris processed,to include method(s)of processing and disposal location(s) <br /> • Daily estimate of hazardous waste debris segregated, and cumulative amount of hazardous waste placed in <br /> the designated holding area <br /> • Number of hazardous trees and hanging limbs removed. <br /> • Problems encountered or anticipated <br /> Typically,Daily Reports are co-signed by the governing entity's inspector to verify work performed. In addition, the <br /> governing entity receives an original copy of all load tickets and receives and verifies for co-signature, a Daily <br /> Reconciliation Sheet listing each load ticket, the truck number, crew number, street, truck volume, percent full, <br /> credited volume of debris removed and the total volume removed for the day. This Daily Reconciliation Sheet is <br /> typically verified by the governing entity and can become the invoicing document for the Contract. <br /> DOCUMENTATION AND RECOVERY PROCESS <br /> Prior to the beginning of the hurricane season, DRC will meet with the City of Sunny Isles Beach and the Debris <br /> Management Monitor to finalize and test the processes for inspection and documentation that are to be used during <br /> the response and recovery phase of debris removal. At all times, DRC will provide the City of Sunny Isles Beach <br /> access to all work sites and disposal areas. DRC, the City of Sunny Isles Beach and the Debris Management Monitor <br /> will have in place at the DMS personnel to verify and maintain records regarding the contents and cubic yards of the <br /> vehicles entering and leaving the DMS. The Debris Management Monitor will coordinate data recording and <br /> information management systems,including but not limited to: <br /> • Prepare detailed estimates and submit to FEMA for use in Project Worksheet preparation. <br /> • Implement and maintain a disaster debris management system linking load ticket and TDSRS information, <br /> including reconciliation and photographic documentation processes. <br /> • Provide daily, weekly or other periodic reports for the City of Sunny Isles Beach managers and the Debris <br /> Management Monitor, noting work progress and efficiency, current/revised estimates, project completion <br /> and other schedule forecasts/updates. <br /> DRC Emergency Services,LLC 68 O''a cncnce�<r:Ea��«nRC <br /> RFP No.18-04-02 Striking east. <br />