My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TFR Enterprises
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
TFR Enterprises
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:58:18 PM
Creation date
5/11/2018 10:37:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management and Removal Services
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QLF.R. Eloc. <br /> DISASTER RESPONSE DIVISION <br /> ® System Manager and attached to the daily CQC report. Exact location of initial <br /> phase shall be indicated for future reference and comparison with follow-up phases. <br /> 7. The initial phase will be repeated for each new crew to work onsite, or at any time <br /> acceptable specified quality standards are not being met. <br /> Follow Up Inspections: <br /> Follow-up inspections will be performed daily or as <br /> frequently as necessary to assure continuing compliance with - <br /> =MUM= <br /> contract requirements, including control testing, until <br /> completion of the segment of work. <br /> Records: TFR will maintain current records of all inspection <br /> and test performed on the format detailed, entitled Quality <br /> Control Report. This form will provide factual evidence of <br /> the required inspections or tests involved, results of --�` <br /> inspections or tests, nature of defects, causes for rejection, Y...� <br /> etc., proposed remedial action and corrective actions taken. <br /> TFR's records will cover both conforming and defective , <br /> items and must include a statement that all supplies and <br /> materials incorporated in the work are in full compliance <br /> with the terms of the contract. Legible copies of these records <br /> will be furnished to a client representative daily. <br /> ® Site Specific Quality Control Plan <br /> The site or Contract specific QC Plan must accomplish the complete daily documentation of <br /> operations, utilization and production, safety, and variations from normal operations of a <br /> debris management operation. It must be in place and approved for use prior to beginning <br /> any field operations, including site preparation. It must be in full compliance with contract <br /> requirements. <br /> Multiple forms are usually formatted for the Plan, which cover different activities. A <br /> summary general Daily form is also usually formatted for the project that is completed by <br /> the CQC Officer, and totals of all activities reported on summary forms. Usually, all <br /> originals and one set of copies are delivered to a designated representative, and TFR keeps <br /> two copies of each form. <br /> Quality Control Organization <br /> The duties and specific areas of responsibility of the various members of the Quality Control <br /> Organization are as follows: <br /> Operations Manager: Advises all supervisory personnel including, but not limited to, Sector <br /> superintendents and key foremen assigned to critical areas, of the requirements of the <br /> specifications and advises supervisors concerning methods to be used and the degree of <br /> workmanship required. <br /> 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.