Laserfiche WebLink
® -Health and safety plan (site safety plan). <br /> -Traffic control and access plan. <br /> -Inspection plan. <br /> -Dust control plan. Page 18 <br /> -Location of ash disposal area, hazardous material containment area, contractor work area and <br /> inspection tower <br /> -Location of incineration operations, grinding operation <br /> -Site restoration plan. <br /> KDF will supply sufficient equipment, staff and resources to process 200-500 cubic yards of debris per <br /> hour per crew. This will be predominantly by grinding or burning if applicable. <br /> Each TDSRS will at a minimum include the following: <br /> -1 grinder and/or Air Curtain Incinerator <br /> -1 trackhoe <br /> -1 dozers <br /> -2 towers <br /> -5 16-20 cubic yard dump trucks <br /> -1 rubber tired loader <br /> -1 water truck <br /> -1 motor grader <br /> -1 site manager <br /> -1 night manager <br /> -8 equipment operators <br /> -2 supervisors <br /> -5 laborers <br /> - light plants <br /> -hazardous material containment area <br /> ® KDF Enterprises, LLC RFP Disaster Debris Management and Disposal Services 18-04-02 <br />