Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Susan Dalton, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />Civil Engineer <br />14. YEARS EXPERIENCE <br /> <br />a. TOTAL <br />30 <br /> <br />b. WITH CURRENT FIRM <br />< 1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Erdman Anthony of Florida, Inc., West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BSE/Civil and Environmental Engineering <br /> <br />17. EDUCATION (DEGREE AND SPECIALIZATION) <br />FL/ Professional Engineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ms. Dalton began practicing civil engineering in Palm Beach County in 1987 and has served as project engineer and project manager on <br />various civil and infrastructure projects. Her responsibilities included agency coordination; road design and review; environ mental <br />reports, surveys and permitting; utility coordination and relocations; bidding and construct ion of projects; contract administration; and <br />drafting supervision. Projects have included design, coordination and construction of pavements; surface water management and <br />drainage systems; environmental mitigation; and water/sewer installations. <br />19. RELEVANT PROJECTS <br />a <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach Isles Neighborhood Improvements <br />Singer Island, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br /> <br />CONSTRUCTION (If Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />This project is a complete re-design of the neighborhood infrastructure. Design included removing and replacing the gravity sewer , <br />mains, services; removing portions of and replacing water mains, services; replacing and removing/abandoning the existing force <br />main; improving the existing drainage system; and adding water quality and control. Ms. Dalton serves on the project as a civil <br />engineer by providing preparation of the specifications, project management and administrative duties. <br />b <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Grandview Heights Neighborhood Improvements <br />West Palm Beach, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br /> <br />CONSTRUCTION (If Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />The project includes a full depth reconstruction of the roadways, replacement of curb/gutters and sidewalks, and replacement of <br />watermains. The existing asbestos-cement watermains will be grout filled and abandoned in place. New water service lines will be <br />installed to the existing meters in the sidewalks. Our design includes a detailed review of the grading of the roadways, back of <br />sidewalks, and driveways to ensure that no drainage issues result after construction. Ms. Gillette serves as Civil Engineer. <br />c <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> Seminole Pratt Whitney Road <br />Western Palm Beach County, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If Applicable) <br />2010 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X ] Check if project performed with current firm <br />Responsible for the roadway design, engineering survey, and plans preparation for the construction and expansion of two to four <br />lanes for 1.3 miles. As a Project Engineer, Ms. Dalton designed, and prepared construction plans related to the road cross secti ons, <br />determining parcel acquisition, storm water management including pond sizing, drainage design, horizontal and vertical pipe <br />placement, utility pole placements and relocations, utility pipe placements and relocations, tree surveys, vegetation and <br />environmental permits. <br />d <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Coleman Park <br />City of West Palm Beach, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Coleman Park is a city project for the development of conceptual and schematic designs for a new gymnasium building on a 3.5 -acre <br />park site. This project includes an extensive public outreach effort which involves taking questions, identifying public need and taking <br />input for incorporation into the design. Conceptual design includes building plans and site engineering: grading, drainage, water <br />and sewer. Ms. Dalton is serving as the civil engineer on the team. <br />e <br /> <br />(1) TITLE AND LOCATION (City and State) <br />S-333N Structure <br />Miami-Dade County, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br /> <br />CONSTRUCTION (If Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project for the SFWMD includes the design and preparation of construction plans and specifications for this $14M gated water <br />control spillway. Project includes a multi-discipline engineering design team comprised of civil, geotechnical, structural, mechanical <br />and electrical engineers as well as experts from SFWMD and the USACE including hydrology and hydraulics. Ms. Dalton is serving as <br />Civil Engineer providing work on project reporting which includes design, value engineering and project status. <br />