My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete One Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br /> <br />3 <br />21. TITLE AND LOCATION (City and State) <br />Island Drive Water Main <br />West Palm Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />2013 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of West Palm Beach <br />b. POINT OF CONTACT NAME <br />Laura Le <br />d. POINT OF CONTACT TELEPHONE NUMBER <br />561-494-1093 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br /> The City of West Palm Beach desires to replace the 8” watermain <br />along Island Drive from the south end of the roadway (at the dead <br />end) to Island Road a distance of approximately one half mile. The <br />water main needs to be installed quickly so that it is in place prior <br />to the Town of Palm Beach’s scheduled resurfacing of the roadway <br />and within the time frames established by the Town for months <br />during which construction is allowed. The tight right of way width, <br />many conflicts within the congested right of way, politically <br />sensitive nature of work in this area, coordination with the other <br />improvement projects (FPL installing underground facilities and <br />the Town repaving the roadway surface), and fast schedule make <br />this a unique and challenging project. <br /> <br />The services include the following: <br /> <br />Survey: Obtain topographic survey information needed for design and plans preparation and establish the <br />right of way lines needed for construction using an <br />assumed datum. <br /> <br />Design: Design the proposed improvements based on <br />the direction from the City. <br /> <br />Permitting: Obtain a permit for construction from the <br />Palm Beach County Health Department and <br />coordinate with the Town of Palm Beach. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a <br />(1) FIRM NAME <br />Erdman Anthony of Florida, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Prime <br />
The URL can be used to link to this page
Your browser does not support the video tag.