<br /> <br />Fort Drum – South Post Roads <br />Fort Drum, New York <br />Duration of Contract: 2011 - 2013 <br /> <br />Erdman Anthony provided design and construction phase <br />support services for the reconstruction and utility <br />enhancements of 6,975 feet of existing streets in the 700, 800 <br />and 900 area of the Fort Drum Military Base, Fort Drum, New <br />York. <br /> <br />The project included utility layout and design for electric <br />distribution improvements and a new telecommunications <br />system. These efforts included installation of underground <br />conduit facilities, building connections and various <br />appurtenances for both the electrical and telecommunication <br />systems. These efforts were completed in order to move key <br />facilities underground from their previous above ground <br />locations. This utility design work posed a significant challenge <br />since existing water, sanitary sewer, gas and other buried <br />telecommunications infrastructure was present throughout <br />the project limits. The electrical and telecommunications <br />design also had to facilitate switch-over with little or no <br />service interruptions. Detailed design profiles were prepared for the new buried tele-communications <br />in order to assure compliance with US Army Installation Information Infrastructure Architecture (I3A). <br />Extensive watermain layout, profile and details for new and relocated water distribution infrastructure <br />was also completed. This effort included new hydrants and service connections to existing buildings. <br />Work also included preparation of a report and application necessary for NYS Department of Health <br />approval of the water improvement plans and specifications. <br />The road reconstruction design provided full depth reconstruction of existing deteriorated concrete <br />pavement with a multi-course asphalt pavement on a minimum 12-inch granular subbase material. The <br />reconstruction also included the addition of sidewalks along 70% of the project, new signing and <br />pavement markings; and a detailed maintenance and protection of traffic plan to maintain access to all <br />the existing military facilities present in the project area, <br /> <br />The scope of our design services included: Preparation of a Stormwater Pollution Prevention Plan, <br />Construction staging / Maintenance and Protection of Traffic Plans, periodic site visits, responses to <br />Request for information and reparation of an As-built record plan. <br /> <br />