Laserfiche WebLink
CONSULTING ENGINEERING SERVICES FOR <br />Golden Shores Utility Undergrounding and Roadway Improvements <br />D–10IWOP41002.18w_Sunny Isles Beach Golden Shores Undergrounding.indd <br /> ƒFDEP CCCL Permit – Required for any significant improvements seaward of the Coastal Construction Control Line, <br />such as street lights to replace the street lighting currently installed on the FPL poles. <br />Contractor Procurement <br />No matter the delivery method that is chosen for a particular project, Kimley-Horn understands the importance of being <br />responsive during the contractor procurement process. Answering contractor questions and issuing clarifications or <br />addenda in a timely manner during the procurement phase will allow us to deliver a successful construction project on <br />time and within budget, thus avoiding navigating through a project riddled with disputes. <br />We are prepared to assist the City in administering the procurement process, including preparation of project <br />specifications, answering bidder questions, reviewing the contractor proposals, and providing the City with a bid or GMP <br />analysis. We can then assist in assembling the construction contract, making presentations to Commission and any other <br />related post award services. <br />On numerous occasions, we have assisted our municipal clients with providing specifications for long lead items in <br />advance of design completion so that they can take advantage of not only the time savings, which is critical to maintaining <br />the construction schedule, but also the tax savings in the direct purchase of equipment. We are ready and able to assist <br />the City with the procurement of these items if it is determined to benefit the project budget or schedule. <br />Construction Phase <br />During the construction phase, you can be assured that you will continue to be <br />served by the same Kimley-Horn professional staff who served you during the <br />design phase. Unlike other firms that separate the construction phase team <br />from the design team, our philosophy is to maintain the continuity of the design <br />staff during construction. Because these individuals are the most familiar with <br />the design of your project, there is no learning curve during its construction. <br />Kimley-Horn’s professional staff has extensive experience in construction <br />administration and will keep the contractor on task, on time, and within budget. <br />Our experience will result in the delivery of a quality project that will make the <br />City and Kimley-Horn proud. <br />Once the contractor is selected, we will immediately request that they submit <br />their time and payment schedules for review. We will identify schedule conflicts, <br />sequence issues, equipment delivery issues, and other factors that may affect <br />the successful completion of the project and address those issues accordingly <br />with the contractor prior to the start of work. <br />Document control will be established from the onset of the project. It is extremely <br />important for project documentation to be properly filed and distributed to all necessary parties, so having an established <br />program for this effort will prove to be very valuable to the project. We use a web based program called ShareFile to store <br />project documentation. This program allows authorized users with the City to have continuous access to all project files <br />during the course of the project. Individual user permissions can be managed to protect the integrity of the files and avoid <br />accidental file mismanagement. <br />We expect construction will consist of the following approach for this project. There are a lot of details to be tended to in <br />between these steps but this is the general process: <br /> ƒThe City’s contractor will install the necessary underground conduits, pullboxes, and other necessary infrastructure. <br />FPL will provide the City’s contractor with materials for installation while the City’s contractor will provide AT&T and <br />Comcast conduit and pullbox materials according to their specifications.