E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Juan E. Jimenez, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Design/Construction Oversight, Civil and
<br />Utilities Engineering
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 23
<br />b. WITH CURRENT FIRM
<br /> 17
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Coral Gables, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering / Florida International University
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer / 56704 / 2001
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Water Distribution and Sanitary Sewage Collection Improvements
<br />Miami-Dade Water and Sewer District (MDWASD)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager for the design and installation of 7,000± linear feet of 12 -inch diameter water mains, 8,000± linear feet of 8-
<br />inch sewer mains and service connections in order to sustain present and future economic redevelopment within a 70± acre,
<br />mostly-industrial area of Miami-Dade County. Services included planning, hydraulic modeling, analysis and design, stakeholder
<br />coordination and public involvement, permitting, assistance during bid and award, and construction phase services. Many
<br />properties in the project area are on private water wells and septic systems, and others are served by the neighboring City o f
<br />Hialeah. The plans included a sequence to transfer those connections from Hialeah to Miami-Dade County without service
<br />interruptions.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami-Dade Water and Sewer Department, 72-inch Raw Water Main
<br />Design, Miami-Dade County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Served as project manager. Kimley-Horn was responsible for the design of approximately 8,800 feet of 72-inch raw water
<br />pipeline through a heavily urbanized section of the City. The project included the implementation of a trenchless technology
<br />(microtunneling) for approximately 1,300 feet under two major canals and a major rail road switch yard.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lakeview District Water and Sewer Master Plan
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. Kimley-Horn prepared a water and sewer master plan for the Lakeview Utility District, a special assessment
<br />district created to expand water and sewer distribution and collection facilities to a 600+ acre portion of the Town of Medley
<br />which is currently undeveloped. In addition, Kimley-Horn performed modeling of the existing water distribution system using
<br />WaterGEMS software to identify potential fire flow deficiencies within the existing distribution system and propose
<br />improvements to the system to address these deficiencies.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Water Main Replacement Program
<br />Hollywood
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Juan has been serving as project manager for the City of Hollywood’s Citywide Water Main Replacement Program. To date the
<br />project has included the replacement of over 77 miles of existing aging and undersized water mains up to 16 -inch diameter in
<br />order to increase flow capacity within residential and commercial areas of the City of Hollywood, FL. The proj ect also includes
<br />replacement of existing fire hydrants and service connections, and addition of new hydrants and services where needed to
<br />meet water service and fire protection requirements. The installations occurred within three major roadway jurisdicti ons: the City
<br />of Hollywood, Broward County, and Florida Department of Transportation (FDOT) District 4.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Water Distribution and Sanitary Sewage Collection Improvements
<br />from NW 41st Street to NW 51st Street, between NW 35th Avenue
<br />and NW 36th Avenue, Miami-Dade Water and Sewer District
<br />(MDWASD), Miami-Dade County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager for the design and installation of 7,000± linear feet of 12 -inch diameter water mains, 8,000± linear feet of 8-
<br />inch sewer mains and service connections in order to sustain present and future economic redevelopment within a 70± acre,
<br />mostly-industrial area of Miami-Dade County. Services included planning, hydraulic modeling, analysis and design, stakeholder
<br />coordination and public involvement, permitting, assistance during bid and award, and construction phase services. Many
<br />properties in the project area are on private water wells and septic systems, and others are served by the neighboring City o f
<br />Hialeah. The plans included a sequence to transfer those connections f rom Hialeah to Miami-Dade County without service
<br />interruptions.