Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Stefano F. Viola, P.E. <br />13. ROLE IN THIS CONTRACT <br />Civil and Utilities Engineering <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 12 <br />b. WITH CURRENT FIRM <br /> 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Plantation, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering / Florida International University <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer / 74655 / 2012 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />SW 212th Street Improvement Project <br />Cutler Bay <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. Kimley-Horn assisted the Town in addressing flooding issues occurring on SW 212th Street between SW 87th <br />Avenue and SW 85th Avenue. SW 212th Street is adjacent to Cutler Bay Senior High School, so during heavy rain events the <br />flooding was impacting access to the school. Kimley-Horn created a design that included exfiltration trench and an outfall to the <br />L-31E canal on the west side of SW 87th Avenue. The connection to the canal required crossing an Army Corps of Engineers <br />levee which entailed additional agency reviews and project coordination to ensure the levee was not compromised during <br />construction. Additionally, as part of the design, Kimley-Horn designed a mid-block crossing on SW 212th Street to improve the <br />pedestrian traffic flows during peak events. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Margate City Center Stormwater Master Permit <br />Margate <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. In an attempt to revitalize the Margate downtown area, the Margate CRA contracted Kimley-Horn to prepare a <br />conceptual stormwater master plan for their 43.7-acre downtown area. As part of this project, Kimley-Horn was tasked with <br />obtaining a conceptual Environmental Resource Permit, which would serve as the backbone for future development phases <br />within this permitted area. The acquisition of the conceptual permit will ease the permitting process at the time of developm ent, <br />and provide security to both the City and future clientele, ensuring that all parcels included within the permit would be available <br />for future development. The project area included a complete stormwater system redesign to incorporate the proposed <br />conceptual development, which will include garden style apartments, townhomes, mid-rise condominiums, civic uses, and <br />commercial developments. The team prepared a master drainage model using ICPR software, evaluated the existing drainage <br />system, created drainage basin delineations and maps , performed a complete hydraulic/hydrologic analysis of the area, and <br />developed the proposed master conceptual drainage improvement plans. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Fort Lauderdale Executive Airport (FXE) Master <br />Drainage/Conceptual Environmental Resources Permit (ERP) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. Prior to this project, FXE did not have an ERO for its property. Without an ERP, each development requires a <br />standalone permit which does not allow for the overall benefit and development of the FXE property as a whole. The purpose of <br />the ERP is to conceptually approve the design concepts of a phased development mast plan for a surface water management <br />system, so long as the general guidelines set forth in the ERP are upheld. The scope includes pre -design services, existing <br />utility coordination, stormwater modeling, schematic plans, conceptual design permit plans, and permitting. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Downtown Phase I and II, and Lake Patricia Roadway/Drainage <br />Improvement Projects, Miami Lakes <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager and provided permitting and construction phase services; also involved with preparation of construction <br />documents and specifications. Kimley-Horn was involved with the design and permitting services to implement a large roadway <br />and drainage improvement project located in Downtown Miami Lakes. The project area consist ed of Bull Run Road from NW <br />67th Avenue south to Ludlum Road and Miami Lakeway North from NW 67th Avenue to Miami Lakes Drive. It also included <br />Main Street and Meadow Walk from Bull Run to Miami Lakeway North. The capital project included approximately one mile of <br />roadway restoration/resurfacing and drainage improvements in residential/business areas, curbing and sidewalk improvements, <br />a new outfall pipe, swale restoration, signing and pavement markings, and site restoration. The drainage improvements <br />consisted of approximately 3,000 linear feet of exfiltration trench, approximately 2,500 linear feet of HDPE piping, approximately <br />40 drainage structures and one outfall structure and headwall. Kimley-Horn also provided construction phase services to <br />expedite the project, confirm the project was built in accordance with the design plans, and to minimize impacts to the <br />community during construction. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />SW 97th Avenue Improvements <br />Cutler Bay <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer for the team that is providing construction phase services for this roadway project in the Town of Cutler Bay. <br />Tasks include shop drawing review, site visits, and utility coordination, as well as resident project representative services . <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2