E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Stefano F. Viola, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Civil and Utilities Engineering
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 12
<br />b. WITH CURRENT FIRM
<br /> 12
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Plantation, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering / Florida International University
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer / 74655 / 2012
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 212th Street Improvement Project
<br />Cutler Bay
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager. Kimley-Horn assisted the Town in addressing flooding issues occurring on SW 212th Street between SW 87th
<br />Avenue and SW 85th Avenue. SW 212th Street is adjacent to Cutler Bay Senior High School, so during heavy rain events the
<br />flooding was impacting access to the school. Kimley-Horn created a design that included exfiltration trench and an outfall to the
<br />L-31E canal on the west side of SW 87th Avenue. The connection to the canal required crossing an Army Corps of Engineers
<br />levee which entailed additional agency reviews and project coordination to ensure the levee was not compromised during
<br />construction. Additionally, as part of the design, Kimley-Horn designed a mid-block crossing on SW 212th Street to improve the
<br />pedestrian traffic flows during peak events.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Margate City Center Stormwater Master Permit
<br />Margate
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager. In an attempt to revitalize the Margate downtown area, the Margate CRA contracted Kimley-Horn to prepare a
<br />conceptual stormwater master plan for their 43.7-acre downtown area. As part of this project, Kimley-Horn was tasked with
<br />obtaining a conceptual Environmental Resource Permit, which would serve as the backbone for future development phases
<br />within this permitted area. The acquisition of the conceptual permit will ease the permitting process at the time of developm ent,
<br />and provide security to both the City and future clientele, ensuring that all parcels included within the permit would be available
<br />for future development. The project area included a complete stormwater system redesign to incorporate the proposed
<br />conceptual development, which will include garden style apartments, townhomes, mid-rise condominiums, civic uses, and
<br />commercial developments. The team prepared a master drainage model using ICPR software, evaluated the existing drainage
<br />system, created drainage basin delineations and maps , performed a complete hydraulic/hydrologic analysis of the area, and
<br />developed the proposed master conceptual drainage improvement plans.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Fort Lauderdale Executive Airport (FXE) Master
<br />Drainage/Conceptual Environmental Resources Permit (ERP)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager. Prior to this project, FXE did not have an ERO for its property. Without an ERP, each development requires a
<br />standalone permit which does not allow for the overall benefit and development of the FXE property as a whole. The purpose of
<br />the ERP is to conceptually approve the design concepts of a phased development mast plan for a surface water management
<br />system, so long as the general guidelines set forth in the ERP are upheld. The scope includes pre -design services, existing
<br />utility coordination, stormwater modeling, schematic plans, conceptual design permit plans, and permitting.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Downtown Phase I and II, and Lake Patricia Roadway/Drainage
<br />Improvement Projects, Miami Lakes
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager and provided permitting and construction phase services; also involved with preparation of construction
<br />documents and specifications. Kimley-Horn was involved with the design and permitting services to implement a large roadway
<br />and drainage improvement project located in Downtown Miami Lakes. The project area consist ed of Bull Run Road from NW
<br />67th Avenue south to Ludlum Road and Miami Lakeway North from NW 67th Avenue to Miami Lakes Drive. It also included
<br />Main Street and Meadow Walk from Bull Run to Miami Lakeway North. The capital project included approximately one mile of
<br />roadway restoration/resurfacing and drainage improvements in residential/business areas, curbing and sidewalk improvements,
<br />a new outfall pipe, swale restoration, signing and pavement markings, and site restoration. The drainage improvements
<br />consisted of approximately 3,000 linear feet of exfiltration trench, approximately 2,500 linear feet of HDPE piping, approximately
<br />40 drainage structures and one outfall structure and headwall. Kimley-Horn also provided construction phase services to
<br />expedite the project, confirm the project was built in accordance with the design plans, and to minimize impacts to the
<br />community during construction.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 97th Avenue Improvements
<br />Cutler Bay
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer for the team that is providing construction phase services for this roadway project in the Town of Cutler Bay.
<br />Tasks include shop drawing review, site visits, and utility coordination, as well as resident project representative services .
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|