Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Kaitlin E. Dombrowski, E.I. <br />13. ROLE IN THIS CONTRACT <br />Civil and Utilities Engineering <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 5 <br />b. WITH CURRENT FIRM <br /> 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering / University of Florida <br />Master of Engineering / Environmental Engineering / University of Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and <br />Discipline) <br />FL / Engineering Intern / 1100017791 / 2013 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Town-Wide Undergrounding of Utilities Program <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst. Subsequent to a state of Florida mandate that FPL “storm harden” all vital infrastructure and utility lines <br />statewide, resulting in the installation of taller, concrete electric poles, the Town of Palm Beach chose instead to convert all <br />aerial electric, communication, and cable lines to an underground location. Kimley-Horn serves as program manager and prime <br />consultant designing and permitting the underground conversion process in close coordination with FPL, AT&T and Comcast. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Town Hall Square Streetscape and Infrastructure Improvements <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst for this historic fountain restoration and roadway beautification project within the heart of the Town’s commercial <br />corridor. Responsible for project design, construction phase services, and coordination of specialty sub -consultants. Phase I of <br />the project included the restoration of the Mizner Memorial Fountain that was originally constructed in 1929. This part of the <br />project was partially funded by the State of Florida through a historic preservation grant. Phase II of the project includes <br />streetscape improvements consisting of landscaped nodes, decorative pedestrian crossings, updated urban park landscaping <br />that creates a public gathering area in the median of the roadway where the fountain feature resides, modification of various <br />underground utilities, replacement of sidewalks with decorative tabby concrete, and the introduction of many landscaping and <br />architectural elements throughout the area. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />D-4 and D-10 Stormwater Pump Station (SWPS) Construction <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst. The Town of Palm Beach selected Kimley-Horn to design improvements to both the D-4 and D-10 Stormwater <br />Pump Stations (SWPS). Kimley-Horn performed design, permitting, and construction phase services for the two projects. The <br />Town of Palm Beach utilized the construction management at risk project delivery method where both stations were <br />constructed simultaneously. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Wellfield Improvements and Engineering Design Services <br />Palm Beach County Water Utility Department (PBCWUD) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst. As a subconsultant to another firm, Kimley-Horn is developing bidding/design documents for improvements to <br />surficial aquifer production wells throughout the PBCWUD service area. Our services include preparation for and attendance at <br />project meetings; client coordination; well siting; review of past construction information including well videos, construction <br />reports, engineering details, and record drawings; bid packages to include design specifications, project drawings, and opini on <br />of probable cost; permitting; and construction phase services. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Bradley Park Improvements <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst. Kimley-Horn served the Preservation Foundation of Palm Beach for landscaping and hardscaping <br />improvements within Bradley Park. Services performed for this project included: replacing existing sidewalks along the park <br />perimeter, regrading the interior of the park, addition of Lake Trail, addition or refurbishment of entry feature, new landsc aping, <br />new landscape lighting, fountain relocation, restroom replacement, and addition of overlook. Our team is pro viding construction <br />document preparation, permitting assistance (SFWMD), Guaranteed Maximum Price Review with contractor, and construction <br />observation. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br /> <br /> <br />