|
44CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Rafael Pina, PE Geotechnical a. TOTAL b. WITH CURRENT FIRM
<br />28 12
<br />15. FIRM NAME AND LOCATION (City and State) Langan Engineering and Environmental Services, Inc. (MIAMI, FLORIDA)
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />B. Sc. Civil Engineering, Florida Institute of Technology Professional Engineer in FL
<br />Nuclear Density/Moisture Content Meter Operator Certification
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Port of Miami Tunnel, I-395 Bridge Widening, Port Island Bridge and Roadway
<br />Improvements, Miami, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2013 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The PortMiami Tunnel (PMT) was constructed to provide direct link between the PortMiami (PM) and the Interstate Highway network.
<br />The project consisted of two 4,300-ft long, 2-lane, 37-ft finished diameter tunnels linking the tunnel linking the man-made islands of
<br />Watson and Dodge, and under the main cruise ship channel in Biscayne Bay. POMT was constructed as public-private partnership
<br />(PPP). As a consultant to the design-build team, Langan provided subsurface investigation and geotechnical engineering evaluation
<br />required for design of the TBM, tunnels, entry/exit shafts, ground improvement, and the associated roadway and access improvements.
<br />During Construction, Langan provided construction administration, support and monitoring during construction of bridge foundations,
<br />support of excavation (SOE) systems for TBM entry/exit shafts, ground improvement (grouting, shallow cement-soil mixing, and cutter-
<br />soil mixing (CSM)), and geotechnical instrumentation monitoring.
<br />Cost: $787M
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Gravity Sewer Interceptors for Master Pump Station 3, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The scope included the installation of 48-inch-diameter and 30-inch-diameter sanitary sewer interceptors with a target design service
<br />life of 80 years. Because of the congested urban nature of the project site, the interceptors were installed primarily using a microtunneling
<br />boring machine (MTBM) with invert depths of 15 to 25 feet. The project also included the construction of vertical shafts for MTBM launch
<br />and retrieval and for the installation of permanent access structures. As the geotechnical consultant, Langan provided subsurface
<br />investigation and geotechnical site characterization necessary for developing the MTBM and shaft excavation methods. Langan also
<br />performed an environmental assessment along the alignment to identify potential sources of soil and groundwater contamination.
<br /> Cost: $18.8M
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />West Avenue Improvements – Phase II, West Avenue, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project consists of infrastructure improvements along about 3,500 LF of West Avenue in Miami Beach, FL.
<br />Improvements include raising of roadway grades, construction of retaining walls, harmonization with adjacent properties,
<br />installation of new drainage systems, replacing water distribution systems and sanitary sewer systems and installation of
<br />new street lights and mast arm structures. Langan completed a subsurface investigation for the proposed improvements
<br />and provided geotechnical engineering recommendations.
<br />Cost: $178,567 (Fees)
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Water Storage Tank and Booster Pump Station and 25th Street Public Works Complex, Miami
<br />Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided subsurface exploration and geotechnical engineering recommendations for an expansion consisting of two, 137-ft diameter,
<br />33 ft-high water storage tanks and pump building. Detailed evaluation of the subsurface data allowed the proposed tank structures
<br />and pump building to be supported on economical shallow foundations
<br />
|