Laserfiche WebLink
45CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Roger Simon Hydro Geologist a. TOTAL b. WITH CURRENT FIRM <br />11 7 <br />15. FIRM NAME AND LOCATION (City and State) Langan Engineering and Environmental Services, Inc. (MIAMI, FLORIDA) <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.Sc., Geophysical Science, University of Chicago <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Brow a rd Count y Conv enti on Ce nter Expansio n a nd Hotel <br />Fort Lauderdale, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Langan served as the environmental and geotechnical consultants for the design of the Broward County Convention Center Expansion and Hotel. We <br />evaluated historic exceedances of arsenic and various point sources identified as part of our historical research. Langan also prepared a Reasonable <br />Assurance Report for installing and operating Class V, Group 6 stormwater drainage wells and a preliminary geotechnical engineering study. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Biscayn e Landing, North Miami, Fl orida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Langan provided environmental assessment, remediation plan development, regulatory support and expert witness services associated with a <br />contaminated former gasoline station on Tyler Street, formerly owned by the City of Hollywood that was the subject of litigation. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Ritz Carlton Residences Beach Renourishment, Sunny Isles, Florida. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Langan provided assessment and environmental consulting services for the development of the Ritz Carlton Residences. Langan services included <br />geotechnical and environmental investigations, tank closure assessments, the preparation of a soil management plan, soil characterization studies, <br />sand compatibilities studies, and pilot testing oversight for blending program to support reuse of excavated sand as beach renourishment and erosion <br />control along 2,000 linear feet of beach front. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Hallandale Beach Hydrogeological Services, Hallandale Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Langan provided hydrogeological services in support of the city’s plan to install pressurized right-of-way stormwater drainage wells to alleviate street <br />flooding. Langan’s scope of work included supervising five 150-ft. test holes in the 120-acre Northeast Quadrant project area and five 200-ft. test holes <br />in the 120-acre Southwest Quadrant project area; evaluating geology and water quality (total dissolved solids); and performing a specific capacity test <br />in potential production zones in the Southwest Quadrant project area. Langan completed both project areas and provided reasonable assurance reports <br />that met the requirements of Chapter 62-528, Florida Administrative Code, as part of the permit package for the new stormwater drainage wells. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />BP Superstop 441 Remedial Action, Fort Lauderdale, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Langan was contracted to provide environmental consulting services for this retail gas station. Langan's scope of work included soil and groundwater <br />delineation, and site assessment report approval; natural attenuation monitoring plan approval; interim source removal; natural attenuation monitoring; <br />and remedial action plan approval order for groundwater remediation. The objective of remediation was to reduce the concentrations of contaminants <br />of concern to below their Natural Attenuation Default Criteria. Post-active remediation monitoring continued quarterly for one year until contaminant <br />concentrations were at or below their groundwater cleanup target level. <br />