Laserfiche WebLink
47CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Monica Diaz Bilingual Public Information Specialist <br /> <br />a. TOTAL b. WITH CURRENT FIRM <br />14 9.5 <br />15. FIRM NAME AND LOCATION (City and State) Infinite Source Communications, Miami FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Arizona State University <br />Bachelors of Arts in Journalism and Mass Communication <br />Public Relations – 2005 <br /> <br />N/A <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />N/A <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) See Project ___ in Section F (2) YEAR COMPLETED <br />City of Miami Beach, Palm and Hibiscus Neighborhood Improvement Project, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Public Information 2016 to 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Lead Public Information Specialist, work includes coordinating day-to-day construction activities on one of Miami Beach’s most affluent <br />neighborhoods. Work includes drafting and disseminating traffic advisories, responding to resident inquiries and claims, meeting one-on-one with residents to <br />discuss water meter conversions and harmonization efforts. <br />Size: Palm and Hibiscus Island Cost: $N/A <br />b. (1) TITLE AND LOCATION (City and State) See Project ___ in Section F (2) YEAR COMPLETED <br />City of Miami Beach, Convention Center Renovation and Expansion, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Public Information 2016 to 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Serves as the Lead Public Information Specialist on the largest Capital Improvement Project in the City of <br />Miami Beach. Responsible for working with the City Managers office to coordinate special events, respond to resident <br />inquiries, draft and disseminate project information to the general public and area residents. <br />Size: Convention Center Cost: $615 Million <br />c. (1) TITLE AND LOCATION (City and State) See Project ___ in Section F (2) YEAR COMPLETED <br />City of Miami Beach, 19 Street Pump Station Installation Project, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Public Information 2017 to 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Serves as the Lead Public Information Specialist on the installation of a pump station and generator as part of the Convention Center Renovation <br />Project. Work includes coordinating with adjacent projects, conducting field meetings and disseminating project information to the community and Miami Beach <br />staff members. <br />Size: 19 Street between Meridian Avenue and Convention Center Drive Cost: $N/A <br />d. (1) TITLE AND LOCATION (City and State) See Project ___ in Section F (2) YEAR COMPLETED <br />Bal Harbour Village, Phase I Utility Improvement Project, Bal Harbour, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Public Information 2016 to 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Served as the Public Information Manager for the installation of a sanitary sewer line and pump station in a residential community. Work <br />included hosting a series of community meetings, meeting with the Village Manager and team to coordinate activities that will have minimal impacts to the <br />community, responding to inquiries and claims. <br />Size: Harbour Way and E Bay Drive Cost: $N/A <br />e. (1) TITLE AND LOCATION (City and State) See Project ___ in Section F (2) YEAR COMPLETED <br />City of Miai Beach, Sunset Harbour Pump Station Improvement Project, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Public Information 2013 to 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Served as the Public Information Officer on Miami Beach’s first pump station and roadway elevation project to mitigate flooding and sea level <br />rise. Work included meeting one-on-one with stakeholders, coordinating daily construction with local businesses and working with residents to minimize <br />impacts to the community. <br />Size: Sunset Harbour Neighborhood Cost: $N/A <br />