My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Maurice Tobon Resume Role a. TOTAL b. WITH CURRENT FIRM <br />28 13 <br />15. FIRM NAME AND LOCATION (City and State) CES Consultants – Miami, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />M.E. – Civil Engineering, University of Florida, B.S. – Civil <br />Engineering, University of Florida <br />Professional Engineer: Florida (License No. 49373), Project <br />Management Professional (PMP) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />Tobon M., Pettit C. (2017), Toolkit for Climate-Water Utility Operations, USAID. <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Wat er an d Wastewa ter Ma sterplan, Palm Bea ch Cou nt y Wa ter Utilities <br />Depa rt m ent <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Direct or of Engin eerin g/Program Ma nager, Mr. Tobon was at an Executive level position managing and providing leadership to a staff <br />of 35 in the Engineering Division and consultant Program Managers for the Water Utilities Department $ 400 Million CIP. Staff includes a <br />total of over 10 professional engineers, construction managers, engineering inspectors and support staff. Personally, responsible for <br />creating the Program Management program (WUD 2020 Capital Improvements Program) by effectively managing staff and consultant <br />partners. Responsible for developing organizational performance measures and structures that balance out competing interests while <br />exercising established policies and procedures, streamlining production and enhancing department’s cross functionality and efficiency. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />20 12 Water an d Wastewater Masterpl an, Palm Beach County Water Utilities <br />Depa rt m ent <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Direct or of Engin eerin g, This project was for the development of the 2012 Water and Wastewater Masterplan for Palm Beach County <br />Water Utilities Department. Both masterplans recommended over 500 million dollars in capital projects which served as the basis for <br />ongoing Capital Improvement Program. The masterplans were developed by consultants under the direction and supervision of Mr. <br />Tobon. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />St ormwater Management Anal ysis River Oaks an d Edgewood Commun ities, City <br />of F ort La uderdal e P ublic Servi ces, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />E ngineering Desi gn Manager, The project was for the development of options to deal with repetitive flooding on these two <br />neighborhoods. The recommendations produced by the consultant in this report for these areas was included with the gravity sewer <br />extension project into these areas. Mr. Tobon was actively involved as technical review and responsibility to include the improvements <br />into the Waterworks 2011 Program. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Wat er an d S ewer Servi c e t o Nort h Count y Airport, Palm Beach Cou nty W at er <br />Utilit i es D epa rtmen t <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Direct or of Engin eerin g, Construction of a 3-mile water main and sewer force main to serve North County Airport. Project also <br />consisted of a jack and bore under an active railroad track. Project was designed and managed during construction by County staff. Mr. <br />Tobon was responsible for the directing and advising on the design and guidance during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.