My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />STANDARD FORM 330 (REV 8/2016) PAGE F-1 <br />Project Overview <br />The Miami-Dade County Water and Sewer Department (WASD), in an <br />effort to comply with the 2013 Consent Decree and improve operation its <br />wastewater collection system to achieve compliance, established the <br />Pump Station Improvement Program (PSIP). Under this program, WASD <br />will repair or replace over 140 existing and non-compliant wastewater <br />pump stations. The improvements vary from pump upgrades to complete <br />pump station and force main upgrades. <br />Scope of Work <br />CES is one of the design consultants selected to analyze and design <br />the improvements to the non-compliant pump stations. C E S i s <br />desig nin g i mprovements for over twent y (20) pump stations a nd <br />connect i ng forc e mains. Our team provides full design services, <br />which includes surveying, geotechnical engineering, civil engineering, <br />mechanical engineering, structural engineering, and electrical <br />engineering. The main complexities of these projects and designs are <br />the accelerated schedules required to meet the Consent Decree <br />schedules. The aggressive schedule requires efficient project <br />management and effective project controls. <br />CES is providing the following services: <br />• Topographic and Utility Survey <br />• Geotechnical Investigations <br />• Utility Coordination <br />• Design Services – pump sizing, electrical, structural <br />• Permitting <br />• Project Management <br />• Construction Management <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />20. EXAMPLE PROJECT KEY NUMBER 2 <br />21. TITLE AND LOCATION (City and State)22.YEAR COMPLETED <br />Pump Station Improvement Program Design, Miami-Dade Water and Sewer <br />Department, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION <br />(if applicable) <br />Ongoing Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade County Water & Sewer Dept. – PSIP <br />Team Reinaldo J. Rivera, PE 305-446-7450 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. CES Consultants, Inc Pembroke Pines, FL Prime <br />b.
The URL can be used to link to this page
Your browser does not support the video tag.