My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />STANDARD FORM 330 (REV 8/2016) PAGE F -1 <br />Project Overview <br />The Miami-Dade County Water and Sewer Department (WASD) planned <br />for the improvement of the hydraulic capacity of the wastewater system <br />within the Doral Basin with the construction of a 48-inch transmission <br />force main. The 48-inch force main will extend along NW 54th Street <br />between NW 79th Avenue and NW 72nd Avenue, connecting two existing <br />large diameter force mains and relieving capacity restrictions. The new <br />pipeline will connect an existing 16-inch force main along NW 79th <br />Avenue and a 48-inch along NW 72nd Avenue. <br />Scope of Work <br />The design services included a preliminary pipeline route analysis and <br />layout, review probable utility conflicts, and preliminary design of the <br />48-inch transmission force main. The pipeline was designed for either <br />PCCP or ductile iron pipe installation. The project is located within the <br />central area of Doral and includes 4,200 linear feet of force main and <br />400 linear feet of micro-tunneling to cross underneath SR 826. <br />Additionally, the project requires the relocation of existing drainage <br />structures, drainage pipes, and water mains. <br />The primary complexities of this project are the numerous existing <br />utilities within this highly traveled commuter and local traffic <br />roadway. Additionally, the coordination to minimize traffic impacts, <br />along with the micro-tunneling component to cross SR 826, adds to <br />the complexity of this design. CES assisted the prime consultant with <br />preliminary design, CADD services, design assistance, and quality <br />assurance reviews. <br />The project includes the following: <br />Utility identification and conflict resolution <br />400 feet of micro-tunneling under a major south Florida <br />highway – SR 826 <br />4,200 feet of DIP or PCCP force main <br />Six (6) line and connection valves, and two (2) air release <br />valves <br />Approximately 10,000 SY of roadway milling and repaving, <br />and roadway traffic re-stripping in accordance Miami Dade <br />Public Works standards <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />20. EXAMPLE PROJECT KEY NUMBER 5 <br />21. TITLE AND LOCATION (City and State)22.YEAR COMPLETED <br />NW 54th Street 48-inch Force Main, Doral, FL - MDWASD <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION <br />(if applicable) <br />2015 N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade Water & Sewer Department Roberto Ortiz, PE Brown & Caldwell 305-704-4429 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. CES Consultants, Inc Pembroke Pines, FL Subconsultant <br />b.
The URL can be used to link to this page
Your browser does not support the video tag.