My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
59CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />AECOM | SOLICITATION # STANDARD FORM 330 (REV 8/2016) PAGE G-1 <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing <br />table. Place “” under project key number for <br />participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Fernando Vazquez, PE Principal in Charge <br /> <br /> <br /> <br />Jose Caraballo, PE <br /> <br /> <br />Project Manager <br /> <br /> <br /> <br /> <br />Ranthus Fouch, PE <br /> <br />QA/QC <br /> <br /> <br />Gustavo Silva, EI <br /> <br />Stormwater <br /> <br /> <br />Erik Alcantara, EI <br /> <br />Stormwater <br /> <br /> <br />Jose Compress, PE <br /> <br />Pump Station <br /> <br /> <br />Simon Sainsbury, PE <br /> <br /> Pump Station <br /> <br /> <br />Jafet Torres, PE <br /> <br />Pump Station <br /> <br /> <br />Tatiana Machado <br /> <br />BIM/Autocad 3D <br /> <br /> <br />Timothy K. Blankeship, <br />PE <br /> <br />Environmental <br /> <br />Rafael Pina, PE <br /> <br />Geotechnical <br /> <br />Marquellus Bennett, <br />MBA, PE <br /> <br />Civil Site Lead <br /> <br />Monica Diaz <br /> <br />Public Involvement <br />Outreach <br /> <br />29. EXAMPLE PROJECTS KEY <br />NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />1 West Avenue Neighborhood Improvements <br />Design/Build 6 Marina del Mar II <br />2 Pump Station Improvements Program Design 7 Gravity Sewer Interceptors for Master Pump Station <br />No. 3 <br />3 Force Main Improvements – NW 12th Avenue 8 SR-5 (SW 2nd Ave/Street) Safety and RRR <br />4 MDPWD SW 27th Avenue Roadway <br />Reconstruction 9 NW 7th Avenue Complete Streets and RRR <br />5 NW 54th Street 48-Inch Force Main 10 Palm and Hibiscus Island – Neighborhood <br />Improvement Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.