Laserfiche WebLink
City of Sunny Isles Beach RFQ No. 18-11-01 | Consulting Engineering Services for Golden Shores Pump Station Rehabilitation (CCNA) <br />AVAILABILITY OF PERSONNEL PER LOCATIONOutlined in the table below is the projected availability (in percentage) of the team members that will be assigned to this contract. All personnel assigned to this contract have the availability to begin work upon contract award, and will maintain availability for the project throughout the duration of the contract. <br />0% <br />10% <br />20% <br />30% <br />40% <br />50% <br />60% <br />70% <br />80% <br />90% <br />100% <br />WORKLOAD AVAILABILITY <br />19