|
<br /> STANDARD FORM 330
<br />
<br />
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Tania Fernandez 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE
<br />a. TOTAL 17 b. WITH CURRENT FIRM 11
<br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• Bachelor of Science in Civil Engineering, IPJAE Havana,
<br />Cuba
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />In-House Consultant for Traffic Operations for the Florida Department
<br />of Transportation
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ms. Borges assists the Department with their workload. Her responsibilities include performing engineering reviews, analyzing
<br />recommendations in traffic engineering reports, using Synchro to perform operational analysis, preparing necessary associated documents
<br />(work orders, traffic regulations, sign designs, etc.), performing field assessments to identify operational and safety deficiencies, and obtaining
<br />and analyzing crash data. In addition, she currently oversees and review several pedestrian and bicyclist studies. Her duties also include
<br />representing the Department in meetings and presentations, and coordination with the public and other government agencies.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) City of Miami River Greenway Streetscape Project, City of Miami,
<br />Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project begins on SW 1st Court and extends through SW 6th Street for a total of 0.379 miles until the S. Miami Ave. overpass. The scope
<br />of work is to enhance the roadway and community through the reconstruction of SW 6th Street, milling and resurfacing of the surrounding
<br />streets, new drainage structures, new sidewalks and curb and gutter, new driveways, improved hardscape, ADA compliant ramps and parking,
<br />new pavement markings, updated signage, lush landscaping on proposed islands and swale, and decorative lighting.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) Traffic Operations Analyst for the Florida Department of
<br />Transportation
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />duties included performing engineering reviews, analyzing and developing traffic engineering reports and associated documents (work orders,
<br />traffic regulations, traffic studies, sign designs, etc.), and performing field assessments to identify operational and safety deficiencies. Ms.
<br />Borges also participated in meetings and presentations, coordinated with Department staff and affected external agencies and customers, and
<br />allocated the necessary resources to implement remedial action. Additionally, she developed and managed professional and contractual
<br />service contracts that supported traffic operations, issued task work orders, reviewed contract deliverables and processed invoices,
<br />coordinated Department personnel and other agencies associated with work under the contract.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) SR 7/NW 7th Avenue at NW 14th Street, NW 17th Street, NW 23rd
<br />Street, and NW 29th Street Signalization Upgrades
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 03
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Safety intersection improvements project which consisted of the installation of protected/permissive left-turn traffic signal heads on the North
<br />and South approaches at the above mentioned signalized intersections. Project also included parking prohibition regulation on the west side
<br />of NW 7th Avenue and NW 29th Street, and the reconstruction of pedestrian ADA ramps and sidewalks.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) ARRA Project Miami Lakeway North Resurfacing and Drainage
<br />Improvements, Town of Miami Lakes, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This was a FDOT ARRA Funded Project in North Shore for City of Miami Beach Public Works. The project consisted of roadway improvements
<br />for Byron Avenue, including milling & resurfacing, new signing and pavement markings, and new safety improvements such as ADA ramps and
<br />sidewalks.
<br />
|