My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@�a <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />CAS has a knowledgeable and experienced construction management team which is important for <br />keeping a construction project on schedule, realizing potential cost savings and minimizing <br />construction impacts. CAS has experienced staff to provide effective contract administration including <br />cost estimating, schedule review, shop -drawing submittal review, processing of change orders and any <br />other related construction management activities. CAS will ensure key construction project elements <br />are documented and updated regularly and that any issues are addressed efficiently. CAS will ensure <br />that the contractor is held accountable, abiding according to design documents and meeting all <br />contractual obligations. CAS will submit monthly construction progress reports to the City of Sunny <br />Isles Beach, which will include summary of work completed, critical issues requiring resolution in order <br />to maintain project schedule, planned budget versus actual cost to -date, planned work schedule for <br />the next month and identification of any upcoming conflicts or other critical items. <br />PHASE V - TESTING, START-UP AND PROJECT CLOSEOUT <br />• Prepare Startup & Testing Plan <br />• Supervise & coordinate all startup and testing activities <br />• Review record drawings <br />• Prepare Operations & Maintenance manual <br />• Prepare final accounting, certifications and close out reports <br />• Project Close -Out <br />QUALITY ASSURANCE/QUALITY CONTROL <br />Quality control throughout the project is handled by means of a check and balance system and <br />through the team's client relationships we form during the project providing continuous open, often <br />face-to-face and honest lines of communication. CAS conducts weekly QA/QC meetings in-house every <br />Monday to ensure that projects are on schedule and within budget. The CAS process will be methodical <br />and timely in approach. The established goals identified in the project initiation will be implemented <br />through the design phase, construction phase and closeout of the project. <br />Members of the Project Team will meet regularly to establish a consistent quality review framework <br />Quality Standards are fundamental to the success of the project. CAS prides itself on the <br />consistent high quality of our output, whether it is project plans, specifications, design <br />elements, comprehensive engineering studies, survey or utility locates. <br />• At CAS we are committed to achieving and maintaining the highest quality standards possible <br />and ensuring the client's satisfaction. Refer to the Exhibit A - CAS Design Process Flow Chart <br />(Section D.1) as an example of the typical QA/QC process implemented. <br />PROJECT MONITORING & BUDGET <br />In order to get the most accurate budget price at the pre -construction phase and the construction <br />phase, CAS breaks down all design elements into numerous detailed items that will add up to the <br />entire project construction cost (Bill of Materials). By doing this our cost estimates are very accurate. <br />Our track record with cost estimates to bids has been within 5-10%. CAS' method utilizes this phased <br />approach towards assisting the City in problem solving and for implementation of stormwater pump <br />station rehabilitation project. Schedule, Cost Control and Team Work - the CAS approach is to develop <br />milestones and defined deliverables with the City in order to meet the City's goals and requirements. <br />21045 Commercial Trial, Boca Raton, FL 33486 9 Ph: 561-314-4445 9 www.craigasmith.com • LB3110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.