My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@��A <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />• Provide plan adjustments and finalize <br />for bidding <br />• Bid project (typical 30 days); solicit <br />qualified bidders <br />• Prepare bid addendums and answer <br />contractor RFI's <br />• Assist City in receipt of bids <br />• Review bids and bidder qualifications <br />• Recommend award <br />• Assist City with contract management <br />A 90% Design Review meeting will be scheduled with City staff for final comments and revisions prior <br />to submitting to regulatory agencies for permitting. CAS has over 35 years of experience and <br />understanding of the regulations and statutes in South Florida and as they pertain to stormwater and <br />drainage and projects. Permitting Agency Coordination which includes compliance with the necessary <br />regulations and proper communication with agencies is an important aspect of any project. <br />Coordinating with permitting agencies during the early stages of the project to identify any "permitting <br />challenges" that may impact the schedule of the project is very important. CAS's experience and <br />relationships with state and Miami -Dade regulatory agencies combined with a proactive approach will <br />ensure the project is permitted in a timely manner. <br />PHASE IV - CONSTRUCTION <br />• Mobilize and prepare site <br />• Prepare safety plan <br />• Project field stakeout <br />• Electrical permits <br />• Shop drawing submittal and approval <br />Begin construction <br />• Construction inspection and reporting <br />• Construction management and administration <br />• Public Involvement/Community <br />Outreach (as required) <br />• Adherence to contract/permitting <br />requirements <br />• Final construction <br />• Final punch -list <br />21045 Commercial Trial, Boca Raton, FL 33486 • Ph: 561-314-4445 9 www.craigasmith.com • LB3110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.