Laserfiche WebLink
@��A <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />• Provide plan adjustments and finalize <br />for bidding <br />• Bid project (typical 30 days); solicit <br />qualified bidders <br />• Prepare bid addendums and answer <br />contractor RFI's <br />• Assist City in receipt of bids <br />• Review bids and bidder qualifications <br />• Recommend award <br />• Assist City with contract management <br />A 90% Design Review meeting will be scheduled with City staff for final comments and revisions prior <br />to submitting to regulatory agencies for permitting. CAS has over 35 years of experience and <br />understanding of the regulations and statutes in South Florida and as they pertain to stormwater and <br />drainage and projects. Permitting Agency Coordination which includes compliance with the necessary <br />regulations and proper communication with agencies is an important aspect of any project. <br />Coordinating with permitting agencies during the early stages of the project to identify any "permitting <br />challenges" that may impact the schedule of the project is very important. CAS's experience and <br />relationships with state and Miami -Dade regulatory agencies combined with a proactive approach will <br />ensure the project is permitted in a timely manner. <br />PHASE IV - CONSTRUCTION <br />• Mobilize and prepare site <br />• Prepare safety plan <br />• Project field stakeout <br />• Electrical permits <br />• Shop drawing submittal and approval <br />Begin construction <br />• Construction inspection and reporting <br />• Construction management and administration <br />• Public Involvement/Community <br />Outreach (as required) <br />• Adherence to contract/permitting <br />requirements <br />• Final construction <br />• Final punch -list <br />21045 Commercial Trial, Boca Raton, FL 33486 • Ph: 561-314-4445 9 www.craigasmith.com • LB3110 <br />